Multiple choice question - choose multiple answers

Instruction:
Read the text and answer the question by selecting all the correct responses. You will need to select more than one response.
Channel Tunnel
The Channel Tunnel, (French: le tunnel sous la Manche; often nicknamed the Chunnel in English) is a rail tunnel beneath the English Channel at the Straits of Dover, connecting Cheriton in Kent, England and Sangatte in northern France. A long-standing and hugely expensive project that saw several false starts, it was finally completed in 1994. It is the second longest rail tunnel in the world, surpassed only by the Seikan Tunnel in Japan. It is operated by Eurotunnel plc.In 1957 the Channel Tunnel Study Group was formed. It reported in 1960 and recommended a railway tunnel of two main tunnels and a smaller service tunnel. The project was launched in 1973 but folded due to financial problems in 1975 after the construction of a 250 m test tunnel. In 1984 the idea was relaunched with an Anglo-French government request for proposals to build a privately funded link. Of the four submissions received the one most closely resembling the 1973 plan was chosen and announced on January 20, 1986. The Fixed Link Treaty was signed by the two governments in Canterbury, Kent on February 12, 1986 and ratified in 1987. The planned route of the tunnel took it from Calais to Folkestone (a route rather longer than the shortest possible crossing) and the tunnel was to follow a single chalk stratum (which meant the tunnel was deeper than the previous attempt). For much of its route, the tunnel is nearly 40 m under the seafloor, with the southern section being deeper than the northern. Digging the tunnel took 15,000 workers over seven years, with tunnelling operations conducted simultaneously from both ends. The prime contractor for the construction was the Anglo-French TransManche Link, a consortium of 10 construction companies and 5 banks of the two countries. Engineers used large tunnel boring machines (TBMs), mobile excavation factories that combined drilling, material removal, and the process of shoring up the soft and permeable tunnel walls with a concrete liner.
Which of the following statements are true about this paragraph?
A
0/0
AnswersDiscussion
Frequency:
Source:
Order: